The Project

During a six-week winter refurbishment along the historic Hatton Flight, providing safe and sustainable welfare for the team presented a unique challenge. With no road access and harsh winter conditions, the project required a solution that could be positioned directly where the work was happening.

The Solution:

Our Armadillo 18 Eco+ was mounted on a floating pontoon, allowing it to sit right beside the lock. This gave the six-person team continuous access to comfortable welfare facilities, exactly where they were needed.

The unit’s Microgrid system powered the Armadillo 18 Eco+ for 95% of the project, while rainwater harvesting and minimal generator use reduced environmental impact. With a full range of facilities on board, the team stayed safe, comfortable, and productive throughout the refurbishment.

Project Details
Customer:
Canal & River Trust
Location:
Hatton Flight
Timescale:
6 Weeks
Contact Us

For any enquiries please contact us:

Our Work in Action

Garic helps businesses across the UK to reduce their emissions while exceeding their customers’ expectations. Discover just how we’re thinking beyond the box to solve problems the length and breadth of the country.