The Project

Lancashire County Council carried out the refurbishment of public highways and paving in and around Clitheroe town centre from April to August 2024. They required an alternative solution for power on-site to reduce noise and CO2 pollution and sought Garic’s advice.

How we helped Lancashire Council operate more sustainably…

Our Microgrid System enabled:

The Solution: Microgrid - Thinking Beyond the Box

LCC needed to power various Accommodation 24 Units, including an Office, Canteen, Meeting Room and drying Room, along with a 12’x9’ 2+1 Toilet Block + waste tank, water tank and steps.

Garics Microgrid system made up of our eco products was perfect for this as the location of the project was a Pay and Display Car park in the town centre of Clitheroe surrounded by residential buildings, shops and bars etc.

 

Eco-products were used:

Microgrid is a custom energy solution tailored to your site’s needs. By prioritising solar energy, it reduces emissions and cuts down on fossil fuel reliance. Proven to lower both your emissions and costs, backed by real data from real customers.

An LCC spokesperson said:

“We are very impressed with the service from start to finish. The Regional Account Manager was very good and advised we try the solar panels, this proved to be very cost effective with us using much less fuel and also good for out carbon footprint.

All the emptying of the tanks and refills were very efficient and on time. A very good service all round.”

Project Details
Customer:
Lancashire County Council
Sector:
Infrastructure
Location:
Clitheroe
Timescale:
April 2024 - August 2024
Key Savings
35% financial savings
98% emission savings
£6,857.12 of fuel saved